3 months of progress on the new house

Earlier this week, we marked the three month mark for our home build. I spent much of the day sitting on the new screened porch – just enjoying the breeze. The day before, I attended my Granny’s funeral. The past month has been extremely emotional and trying as she has struggled and ultimately passed on. I have been fortunate in my life not to have lost many of my family members during my (soon to be) 30 years. So, while I was surrounded by an amazing new home that has moved from a dream, to paper, to being built, the time has been bittersweet.

It is very amazing how much has happened with the house in just three short months. The lot was cleared in early July and then footings were dug and poured on July 13 and 15. Since that time, we have an actual house on site. At the last draw (a couple weeks ago), we were an estimated 60% completed on the house. Today, I would personally estimate that we are closer to 70% complete.

Inside the house, we have finish carpentry going in – crown molding, baseboard, interior doors and door trim throughout in preparation for the painters to come in next week. Our cabinets have arrived from the factory and should be installed in the coming week. Outside, our front door has arrived and been installed. The siding around the front door (the very last section) has been completed and our shutters have been installed. On the outside, the only things I see left are finish electrical, steps and painting some of the trim around the porches.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s